From site review to handover

See how we take the job from plans to opening.

Drawings, decisions, trades, inspections and outstanding items remain assigned throughout construction.

01

Review the site

Start with the address, use, lease stage, menu, equipment needs and target opening.

  • Existing use and condition
  • Exhaust route and roof access
  • Utility and drainage capacity
  • Access and landlord conditions
02

Plan the work

List what APEX will handle and what the owner, landlord, consultants and specialist trades must provide.

  • Required drawings
  • Equipment responsibility
  • Permit and inspection responsibility
  • Allowances, exclusions and open decisions
03

Prepare drawings and submissions

Bring the kitchen, equipment and building systems into the drawings required for the job.

  • Kitchen and equipment plan
  • Architectural and engineering information
  • Health-unit plan review
  • Building and trade submissions
04

Order equipment and build

Plan equipment delivery, field work, shutdowns, access and specialist trades in the order the job requires.

  • Equipment schedule
  • Site access and protection
  • Trade work
  • Changes and progress updates
05

Inspect and hand over

Close deficiencies and collect the documents the owner needs for the finished space.

  • Required inspections
  • Testing and commissioning
  • Deficiency closeout
  • Final documents and turnover
Responsibility matrix

Every part of the job needs a named owner.

The signed proposal is the project-specific source of truth. It separates work APEX performs from specialist work it coordinates and information the owner or landlord must provide.

01

APEX project scope

The proposal identifies the site review, planning, construction management, procurement, coordination and closeout work assigned to APEX.

02

Specialist and regulated work

The responsible architect, engineer, equipment provider or regulated trade is named for work that requires a specific licence, design authority, test or certificate.

03

Owner and landlord inputs

Lease conditions, base-building information, approvals, owner-supplied equipment, operating decisions and required sign-offs remain visible in the project list.