Services / 06

Commercial kitchen restoration & upgrades

Renovate an operating, outdated or damaged kitchen while protecting the parts that still need to remain in service.

Tell us what you need and your city. Plans aren’t required to start.

Kitchen upgrade in progress with new burners, a wok range and stock pots beneath the exhaust hood06 / 07
Sam Divanbeigi, founder and principal of APEX
Meet Sam Divanbeigi

25 years of construction experience.

APEX’s founder and principal reviews estimates before they reach you.

Meet the person behind APEX
Real APEX work

See kitchen installations, restaurant interiors and bar fit-outs from our project collection.

View project photos
The goal

Decide what must be repaired, what can stay and how the work will fit around shutdowns and daily service.

When to call us
  • An older kitchen has worn surfaces, equipment or an inefficient layout.
  • Surfaces, utilities or ventilation need coordinated repair or replacement.
  • A concept change requires new workflow, equipment or finishes.
What is included
  1. 01Retained-equipment and existing-condition review
  2. 02Selective demolition and protection planning
  3. 03Floor, wall, counter, layout and equipment upgrades
  4. 04Affected ventilation, plumbing and electrical coordination
  5. 05Trade and inspection coordination
  6. 06Phasing and handover planning
Before we start

What we need to check.

  • Operating hours and shutdown windows
  • Hidden conditions behind walls and ceilings
  • Compatibility of retained systems
  • Insurance, landlord and authority documentation
How the scope moves

A practical sequence for the work.

The exact responsibilities are confirmed in the proposal. This is the planning path we use to expose missing information before it reaches the site.

01

Document the existing kitchen

Review equipment, surfaces, layout, utilities, ventilation and visible damage before deciding what can remain.

02

Separate retain from replace

Set the repair, upgrade and replacement scope around condition, compatibility, workflow and the available budget.

03

Plan the shutdown

Sequence protection, demolition, trade work, equipment moves, testing and handover around operating constraints.

Before we price the work

Questions owners ask first.

Can a commercial kitchen be renovated in phases?

Sometimes. Safe separation, temporary operations, utility shutdowns, inspections and access all affect whether phasing is practical.

How do you decide what equipment or systems to retain?

The decision should consider condition, capacity, code and listing requirements, maintenance history, layout fit and the cost of adapting the new work around it.