Coordinate the kitchen, service counter, dining areas, building systems and construction sequence as one restaurant project.

Restaurant dining and service area beside an open foodservice counter07 / 07
The goal

Keep front-of-house decisions aligned with the kitchen, utilities, landlord requirements and opening plan.

When to call us
  • You are converting a shell or another commercial use into a restaurant.
  • A second-generation restaurant needs a new concept, kitchen or customer flow.
  • An operating restaurant needs a phased renovation or capacity upgrade.
What is included
  1. 01Existing-condition and restaurant-use review
  2. 02Kitchen, service and customer-flow coordination
  3. 03Construction and building-system scope planning
  4. 04Landlord, equipment and specialist-trade coordination
  5. 05Deficiency, testing and handover planning
Before we start

What we need to check.

  • Lease, permitted use and landlord design criteria
  • Kitchen exhaust, utilities, drainage and equipment requirements
  • Customer, staff, receiving, waste and accessibility routes
  • Operating hours, shutdowns, neighbours and delivery access
How the scope moves

A practical sequence for the work.

The exact responsibilities are confirmed in the proposal. This is the planning path we use to expose missing information before it reaches the site.

01

Define the operation

Document the menu, service model, seating or queue, staffing, deliveries, storage, cleaning and target opening before the layout is fixed.

02

Coordinate front and back of house

Align the kitchen, pass, counter, dining or pickup areas with equipment, exhaust, utilities, lighting, finishes, access and landlord interfaces.

03

Sequence construction and turnover

Assign drawings, trades, owner decisions, equipment deliveries, inspections, deficiencies and final documents in the project schedule.

Before we price the work

Questions owners ask first.

When should a restaurant contractor review a candidate unit?

Before lease conditions are waived, when possible. The proposed use, exhaust route, utilities, drainage, access and landlord criteria can materially change the fit-out scope.

Can the dining room and commercial kitchen be planned separately?

They can have different designers and trades, but their service flow, utilities, counter interface, deliveries, waste, lighting and construction sequence still need one coordinated plan.

Can an operating restaurant be renovated in phases?

Sometimes. The decision depends on safe separation, shutdown windows, utility work, equipment moves, access, inspections and whether temporary operations are practical.